You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Crossing Saluran Di Jalan H. Suit Rampung Hari Ini

Crossing Channel Construction on Jalan Haji Suit Completed

The North Jakarta Water Resources (SDA) Sub-agency completed the construction of a channel crossing at Jalan Haji Suit, RT 04/06, Semper Barat, Cilincing.

This channel was made because the location is often inundated

Cilincing Sub-district SDA Executing Unit Field Coordinator, Nandi said the channel crossing construction is a follow-up to the proposal of the local RT/RW administrators.

"This channel was made because the location is often inundated due to small channel and unable to accommodate water in large quantities," he expressed, Monday (5/29).

City Secretary Setyono Monitors Water Level in Manggarai

He explained the channel, which was built four meters long, 100 centimeters high, and 80 centimeters wide involved five personnel since last week.

"Today has entered the finishing stage," he explained.

He hoped that the channel could minimize inundation when it rains.

"We also urge residents to take care by not throwing garbage into the channels," he stated.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1083 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye519 personDessy Suciati
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye468 personBudhi Firmansyah Surapati
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  5. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye440 personNurito